Batch File Rename 0.8.4209.11455
The Batch File Rename tool is a fast, flexible tool that renames many files in one go. Files are renamed based on logical sets of rules, like search and replace, which can be saved for easy later retrieval. Its has been designed to be simple and fast to use, without compromising on power, whilst providing a constant visual preview of the new file names. ...
Author | Aaron Stewart |
License | Freeware |
Price | FREE |
Released | 2011-07-13 |
Downloads | 210 |
Filesize | 840 kB |
Requirements | |
Installation | Instal And Uninstall |
Keywords | File Rename, Batch Rename, File Manager, Renamer, Rename, Batch |
Users' rating (5 rating) |
Using Batch File Rename Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of Batch File Rename on rapidshare.com, depositfiles.com, megaupload.com etc.
All Batch File Rename download links are direct Batch File Rename full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, Batch File Rename keygen, crack.
Consider: Batch File Rename full version, change order full download, premium download, licensed copy.