DiffView 1.6.0.0
DiffView is a program written in C#.NET 3.5 SP1 and able to log modifications of a given program:
Make a diff into files (you can select folders to analyze in a treeview).
The program will give you a list of modified and created files within the specified range (in minutes)
Make a diff into registry (you can select keys to analyze in a treeview).
Quick scan (shows only modified keys within the specified range (in ...
Author | Adlice Software |
License | Freeware |
Price | FREE |
Released | 2017-04-06 |
Downloads | 165 |
Filesize | 317 kB |
Requirements | Microsoft .NET 3.5 Framework |
Installation | Instal And Uninstall |
Keywords | registry modification, file modification, log modification, modification, change, logger |
Users' rating (6 rating) |
Using DiffView Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of DiffView on rapidshare.com, depositfiles.com, megaupload.com etc.
All DiffView download links are direct DiffView full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, DiffView keygen, crack.
Consider: DiffView full version, change order full download, premium download, licensed copy.