DSpeech 1.72
DSpeech is a TTS (Text To Speech) program with ASR (Automatic Speech Recognition) functionality integrated. It is able to to read aloud the written text and choose the sentences to be pronounced upon the vocal answers of the user. It is specifically designed to provide quickly and directly the functions of better practical usefulness that are requested to this kind of programs. In the meantime the spent of resources is minimal. ...
Author | Dimitrios Coutsoumbas (Dimio) |
License | Freeware |
Price | FREE |
Released | 2018-12-14 |
Downloads | 3153 |
Filesize | 3.19 MB |
Requirements | On Windows NT4/2000 you need to install MS-SAPI5.1 (search for "sapi51.msi") |
Installation | No Install Support |
Keywords | TTS, ASR, text to speech, recognition, vocal, speech, multimedia, voice, text, voices, SAPI, SAPI5, vocal engines, audio, script |
Users' rating (29 rating) |
Using DSpeech Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of DSpeech on rapidshare.com, depositfiles.com, megaupload.com etc.
All DSpeech download links are direct DSpeech full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, DSpeech keygen, crack.
Consider: DSpeech full version, change order full download, premium download, licensed copy.