Filo 4.45
Filo enables you to edit file and folder properties. Simply drag files and folders from Explorer, drop them onto Filo and let the program modify their time and attributes according to your criteria. Filo can selectively modify thousands of files and folders in a single operation by processing entire directory trees and filtering their content by name or attribute. The program also includes a log section and a test mode. ...
Author | Basta Computing, Inc. |
License | Free To Try |
Price | $12.95 |
Released | 2021-01-27 |
Downloads | 374 |
Filesize | 3.45 MB |
Requirements | 10MB free disk space. |
Installation | Install and Uninstall |
Keywords | basta, filo, file, touch, folder, directory, edit, modify, change, fix, date, time, stamp, attributes, tree, read, only, hidden, system, filter, batch, sort, modified, created, accessed, synchronize |
Users' rating (19 rating) |
Using Filo Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of Filo on rapidshare.com, depositfiles.com, megaupload.com etc.
All Filo download links are direct Filo full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, Filo keygen, crack.
Consider: Filo full version, change order full download, premium download, licensed copy.