- Software
- - Graphic Apps
- - Other
- - GT Text
GT Text 2.0.2
In the research of algorithms that extract text from color images a set of files with the exact location of the text is needed to avoid inefficient and tedious visual checks of the results. This Ground Truth information saves enormous time and gives accuracy. ...
Author | David Torne |
License | Open Source |
Price | FREE |
Released | 2016-05-30 |
Downloads | 237 |
Filesize | 2.70 MB |
Requirements | |
Installation | Instal And Uninstall |
Keywords | text extractor, image to text, image analyzer, extractor, image2text, extract |
Users' rating (6 rating) |
Using GT Text Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of GT Text on rapidshare.com, depositfiles.com, megaupload.com etc.
All GT Text download links are direct GT Text full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, GT Text keygen, crack.
Consider: GT Text full version, change order full download, premium download, licensed copy.