PedScope 2.3.01
PedScope is a standalone Windows and Mac application for advanced pedigree analysis, with applications in captive breeding programmes for endanged species conservation and safe breeding practices within closed or small populations such as pedigreed livestock, cats, dogs, etc. ...
Author | Tenset Technologies Ltd. |
License | Trialware |
Price | $299.00 |
Released | 2014-04-17 |
Downloads | 194 |
Filesize | 8.60 MB |
Requirements | |
Installation | Instal And Uninstall |
Keywords | pedigree analysis, analyze pedigree, genetic analyzer, pedigree, animal, analyzer |
Users' rating (5 rating) |
Using PedScope Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of PedScope on rapidshare.com, depositfiles.com, megaupload.com etc.
All PedScope download links are direct PedScope full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, PedScope keygen, crack.
Consider: PedScope full version, change order full download, premium download, licensed copy.