QuickImageComment 4.58
Display/change of Exif, IPTC, XMP data in JPEG / TIFF / RAW images (also multiple files simultaneously), especially for comment and author; display/change of recording location on map; rename files based on meta data; delete the metadata (selected or all with exceptions); comparing the properties of files; export of properties to text files; search via meta data ...
Author | Norbert Wagner |
License | Freeware |
Price | FREE |
Released | 2024-03-17 |
Downloads | 190 |
Filesize | 14.67 MB |
Requirements | 512 MB free main memory; 30 MB disk space |
Installation | No Install Support |
Keywords | EXIF, ITPC, XMP, JPG, TIFF, RAW image, rename, meta data, read display, change, date of recording, time of recording |
Users' rating (13 rating) |
|
Our rating |
![]() |
Using QuickImageComment Free Download crack, warez, password, serial numbers, torrent, keygen, registration codes,
key generators is illegal and your business could subject you to lawsuits and leave your operating systems without patches.
We do not host any torrent files or links of QuickImageComment on rapidshare.com, depositfiles.com, megaupload.com etc.
All QuickImageComment download links are direct QuickImageComment full download from publisher site or their selected mirrors.
Avoid: change order oem software, old version, warez, serial, torrent, QuickImageComment keygen, crack.
Consider: QuickImageComment full version, change order full download, premium download, licensed copy.